Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters.
Roofing shingles how to apply.
Handy home shows you universal shingling techniques that can be applied to any shed.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Center a 914 mm 36 width strip of an ice and water protector membrane in the valley.
Using the chalk line snap a line between the two marks to get a straight edge.
How to do it prep work space.
The recommended flashing material is a 28 gauge galvanized metal or an equivalent corrosion resistant non staining material check with local codes.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house.
See below for a shopping list tools and steps subscr.
Shingling a shed and want some tips.
Complete the application of underlayment and valley flashing before the roofing shingles are applied.
Starting at the bottom of the roof map out a guideline with chalk.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
Adhere the shingles adjacent to the flange with roofing tar.
Install a starter strip.
Trim the shingles away from the ridge vent hole.
Watch and see how easy it is.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
If possible have the shingles delivered via a boom directly onto the roof.
First snap a line for the top of the.
Many pros shingle in a vertical line up the roof because it s much faster.